Inner Circle
← Back to Listen
Content

#694: Bath Fans, Too Many Minisplits, and Second-Story Additions

⏱️ 52:37 🎀 Patrick McCombe, Randy Williams, Ian Schwandt, Cari Delahanty
AUDIO EPISODE
#694: Bath Fans, Too Many Minisplits, and Second-Story Additions
0:00
0:00

Chapters

Click to jump to section

  • 0:22
    Shipping & Supply Chain
    Ian discusses shipping statistics from the Port of Long Beach, highlighting recent spikes and drops in cargo movement and their potential impact on material availability and pricing in construction.
  • 3:42
    Construction Pricing Strategies
    The hosts discuss the challenges of providing cost estimates in an unstable market and how different contractors approach fixed-price contracts versus cost escalation clauses.
  • 24:05
    Pump Jacks & Scaffolding
    The team shares experiences and opinions on pump jacks versus pipe staging for exterior work, discussing their safety, efficiency, and common uses in different building environments.
  • 36:57
    Fire Doors for Garages
    A listener asks about high-performance, fire-rated garage entry doors, prompting a discussion on code requirements, product availability, and challenges with local amendments.
  • 47:35
    Bath Fans in Tight Homes
    A listener details issues with bath fans struggling in a very tight ADU, leading to a discussion on makeup air, ERV/HRV systems, and the implications of ultra-tight building envelopes.
  • 1:16:40
    Too Many Mini-Splits
    The hosts analyze a listener's photo of a house with seven mini-split condensers, debating the reasons for such an extensive setup from financial, comfort, and building science perspectives.
  • 2:47:10
    Second-Story Additions
    A discussion on using panelized walls and crane-lifted roof trusses for second-story additions, focusing on dry-in time, cost savings, and managing water exposure during construction.

Speakers

P
Patrick McCombe
Host β€” Senior Editor
R
Randy Williams
Editor, Green Building Advisor
I
Ian Schwandt
Contributing Editor and Production Manager for TDS Custom Construction
C
Cari Delahanty
Host β€” Producer

Key Takeaways

✦

Monitor shipping and supply chain data (e.g., Port of Long Beach TEUs) to anticipate material availability and price fluctuations for construction projects.

✦

Be aware of how market volatility impacts material costs and adapt pricing strategies, such as incorporating cost escalation clauses or understanding commodity versus non-commodity price trends.

✦

Prioritize worker safety at height by carefully choosing between pump jacks, pipe staging, or lift equipment based on site conditions and project duration.

✦

Understand local building codes for garage-to-house fire doors; standard 20-minute doors are often sufficient, but some municipalities may require 1-hour ratings, necessitating a full-assembly approach.

✦

For ultra-tight homes, consider integrated ventilation solutions like ERV/HRV systems with boosted capacity for bathrooms instead of relying solely on exhaust-only bath fans, to ensure proper makeup air and avoid negative pressure.

✦

When designing HVAC for tight homes, evaluate whether a multi-head mini-split system is truly optimal or if ducted mini-splits or a balanced ERV/HRV system would offer better performance and cost-effectiveness for specific zones.

✦

For second-story additions, plan for potential water exposure during construction by using temporary waterproofing (e.g., EPDM over floor systems) and having strategies for drying out wet materials if a storm hits.

Want the full experience?

Join the Inner Circle for full access to every episode, AI-powered insights, personalized coaching, and a network of industry leaders.

Join Inner Circle β†’

Inner Circle Membership Portal © 2026 Power100. All rights reserved.

power100.io