Building in a different Era (feat. Pop & Dad)

Chapters
Click to jump to section
Speakers
Key Takeaways
Prioritize direct communication: Instead of relying on RFIs, pick up the phone and talk directly with architects and engineers to resolve issues efficiently.
Cultivate strong relationships with designers: Build rapport and mutual respect with design teams to foster collaboration and problem-solving, rather than adversarial dynamics.
Embrace hands-on experience: Encourage or provide opportunities for field experience for project managers to develop a deeper understanding of how buildings are constructed.
Focus on complete and excellent designs: Advocate for designers to provide thorough and well-dimensioned plans to minimize on-site confusion and re-work.
Re-evaluate self-performing work: Consider the benefits of self-performing key trades to maintain control over processes, quality, and foster a more cohesive team environment, despite liability concerns.
Instill a positive attitude: Encourage team members to find enjoyment in their work and approach challenges with a "make it a winner" mentality to improve morale and productivity.
Learn from past practices: Study historical methods of project management and collaboration to identify effective strategies that may have been lost in the pursuit of efficiency and specialization.
Want the full experience?
Join the Inner Circle for full access to every episode, AI-powered insights, personalized coaching, and a network of industry leaders.
Join Inner Circle β