Key Takeaways
Before purchasing raw land, assess potential risks like environmental regulations (e.g., wetlands) and factor in the time and cost for necessary approvals.
Engage specialized experts like ecologists and engineers early in the process to understand land constraints and guide regulatory applications.
Budget significant time for environmental approvals (e.g., DEP waivers), as these processes can be lengthy and unpredictable, often taking a year or more.
Understand the financial implications of land purchases; even if building doesn't proceed, approved land can be a valuable asset for resale, generating equity.
When designing a project on constrained land, work closely with civil engineers and designers to integrate site features (like wetlands) into the layout for optimal use and minimal environmental impact.
Be prepared for iterative processes with regulatory bodies; plans may need to be adjusted based on their feedback and requirements (e.g., septic system design based on grading plans).